CONSTRUCTION STORIES
BMW
Plant W15.10 - December 2021 - On Going
*Earthworks (Excavation, Crushed Stone Backfilling, Road Concrete Technology)
*Civil works (Interior walls, plastering, rendering, drywall
etc.)
Completed_Infrastructure for Sprinkler Piping_5000 meter_(Subcontractor Szabadicz KFT):
*Excavation, Piping and Backfilling
Compeleted_Paint Shop_Completed (Subcontractor of KESZ Epito)_10000 sqm
Hajdúszoboszló Corner Residence
January 2024 - on going
680 sqm_3 Floor Residence with 11 Apartments and 1 Shop
*Build-and-Sell loan Project
*Separate Garage
*Reinforced Concrete Technology
*Composite Thermal Insulation
*Watertight roof
*Heat Pump Technology
EVE Battery Plant
October 2023 - on going
EVE Battery Plant: 120.000 sqm
GC: CCSC
Subcontractor: General Force
Job Description: Site Levelling of Entire Area 120.000 m2)
*Coordination with Archeological Authorities
*Archelogical Pit Creation
*Top Soil Removal
*Excavation
*Backfilling
*Government Permit Application